Craftsmen Group Inc/ Renovation Projects/ Bragg Creek - water damage restoration

Bragg Creek - water damage restoration

Basement, Bathroom, Disaster Restoration, General Contractor, Interior Paint, Tiles

Project details

Location

Bragg Creek, AB

Budget

$60,000

Project duration

4 months

Completion date

March 2022

Project description

There was a leak from the upper bathroom which caused damage to the main floor and the basement bedroom & ensuite. The pine ceiling was removed along with drywall and the entire shower in the bathroom. The main floor carpet was replaced with engineered hardwood.

Project Location